Wednesday, November 10, 2010

Progress,Island Hood installed


So.... no way there will be any cooking surfaces for Thanksgiving... all the guests will be bringing the sides... I'm onto FoodNetwork to see the latest tips on BBQ turkeys and I guess we'll "wing" it... ha ha ha

Saturday, November 6, 2010

MY KITCHEN End of Week One




Plumbing rough in nearly complete on appliance well. Copper pipes are for Main Refer. Ceiling shows recessed housing for lights which will all be energy compliant LED fixtures.
Problems of the week: windows delayed, wine refer never made it onto the final order, sump pump now installed under house, tree roots have invaded drainage pipes.
Next week: finish electrical installations for 1st inspection before closing ceiling/walls

Thursday, November 4, 2010

H2 under consideration for 2011 NKBA Awards


SF Showcase 2010 under consideration for NKBA Best in large kitchen designs... we'll keep you posted !!!

Day 4


Notice the big hole in the floor.... come to find out that there is 12" of standing water under the house.... side trip for investigation, sump pump etc etc.... all runs up the tab

Saturday, October 30, 2010

2 days till Demo



Here are the before pics. This week ends job is to get the whole place packed up, set up a satellite "kitchen", make a load of chili and other dishes to freeze so when the ovens and cooktop are gone we have some good stuff in stock.....