Thursday, April 29, 2010

Saturday, April 24, 2010

Beautiful CaesarStone Counters


Fortunate to have had 100% material donation by CaesarStone, we chose Buttermilk with a nice 3" edge detail

Friday, April 23, 2010

The beautiful work of CHRIS TOMASI

One of 2 custom pieces created for the Marin Master Suite this handsome cabinet sports custom paneled doors (thank you Carlos of Jacara Designs) the other piece is a custom fireplace mantle/surround in the bedroom. Come by to see both. www.marindesignersshowcase.org

SF Kitchen Lighting Soffit Install and Decorative Pendants 4/22


With a scant 4 days left to go before Press Day, the kitchen is being dressed in final touches of decorative lighting. Plumbing installation is today, Andy Fleischman tiles will be grouted this evening, valances were installed today. It's almost time to get the show on!

Monday, April 19, 2010

Friday, April 16, 2010

ALWAYS HIRE PROFESSIONALS :0)

These guys from AIS really know their business of installing high end appliances. The installations are seamless.
Time to take a break now, as we come down the home stretch for the SF Showcase. Wall covering installed, Hood finish applied, only 1 counter left to go along with the backsplash. The decorative lighting is all next week and then VOILA` Come and see the completed project!

Tuesday, April 13, 2010

SF Taking shape


All the hardware was installed today, many of the counters as well. The appliances even made the mad trip from the basement to the kitchen and are piled up ready to install. Tomorrow the counters should finish up and we'll get started on the backsplashes! Affinity Studios somehow manages to work around all this chaos and Peta is applying a finish to the plaster walls/ceiling

Monday, April 12, 2010

SF Floor Finished!


This week: all cabinet hardware, counters, backsplash, venetian finish, David Goldberg Fern paper installations. Next week: all decorative lighting, trims, painting of trims. The following week: "TA DA!!"

Saturday, April 10, 2010

HOLD THIS IMAGE MARIN DEMO



Hold these images in your mind--- Cinderella's coach is about to arrive... we'll be silent for the next 2 weeks while transformations continue and finishing touches are completed.

Friday, April 9, 2010

Wednesday, April 7, 2010

Deborah Childress Work @ Marin Showcase


BlindSpot Mirror’s minutely detailed frames are created entirely by hand using botanical or abstract themes in contemporary, transitional or traditional styles. Frames are individually cast using fiber-reinforced gypsum cement providing a structurally strong, relatively light mirror. Each frame is hand detailed and finished with four to six layers of metallic pigment.

Tuesday, April 6, 2010

Marin Showcase Participating Artists



We are thrilled and honored to present the art of Matt Rogers and Sharon Paster adorning our Master Suite Walls. You will have to come and catch the synergy between Matt Rogers work and Sharon Paster's. The delight will be all yours

SF Laying the Wood Floors

Planning around the hardwood floor installation is a bit dicey, originally the floors were just being patched in and sanded/stained. Working counter installation around all this is just another detail to be sorted out

Monday, April 5, 2010

CaesarStone MOTIVO LACE!


The shower walls are being dressed as I type in the fabulous NEW product by CaesarStone USA===MOTIVO LACE-- enveloped in the wetness of "lace" as you shower-- totally a happening thing!